HV Cable Installation

HV Cable Installation – 350m of 240mm Copper High Voltage Cable

Industry Sector: Docks / Shipyards

Background

HV Cable Installation – The client’s requirement was to remove a substation from their private network. C&P Engineering Services were tasked with trenching 350m of cable trench and installing 350m of high voltage 240mm cable to joint out the substation.

Project Duration

3 Weeks

Technical Remit

  1. Design & size the cable
  2. Excavate a 350m cable trench
  3. Identify existing cables at joint location, cable spike specified cables, install and joint the HV 350m of 240mm cable.
  4. Pressure test & phasing
  5. Project management & act as principal contractor

Outcome

Successful installation of 350m, high voltage cable, excavated a 350m cable trench, jointed the 240mm cable and acted as the principal contractor.

Read More About High Voltage Electrical Project Experience

For further information aboutĀ C&P’s High Voltage and other Integrated Electrical Services, please click on one of the links below: