11kV Substation Installation

11kV Substation Installation

Industry Sector: Government Laboratory

Background

11kV Substation Installation – The client required a new HV electrical supply to a number of small buildings and the HV electrical supply also required upgrading. The design called for a new 11kV substation to be installed in a remote part of the site.

Project Duration

8 Weeks

Technical Remit

  1. Design.
  2. Supplied and installed a ring main unit & transformer combination.
  3. Carried out civil works and installed a new concrete base, complete with security fencing.
  4. 3 Phase HV cable installation – required a trench through a forest, which crossed roads and footpaths, train tracks and many underground obstacles on the client’s estate.
  5. Connection of the new substation to the point of connection.
  6. Completed joints and terminations.
  7. Test and commissioning.

Outcome

Successful Installation. Project delivered on time, to plan and in budget.

Read More About High Voltage Electrical Project Experience

For further information aboutĀ C&P’s High Voltage and other Integrated Electrical Services, please click on one of the links below: