Blaengwen Windfarm in Alltwallais, Camarthenshire
– 10 Turbines, 23mw, Size £4.2m HV Electrical BOP and contestable package
– 132kV overhead trident line
– WPD specification of 132kV circuit breaker bay
– Customer 132kV transformer switchgear and disconnectors
– 33kV switchboard and distribution system
– Supply install, test and commission

 

Kilgarven Windfarm in County Kerry & Coomlagahrey Primary Substation
– 38 Turbines, approx100mw, Size £4m HV Electrical BOP Package
– 110kV overhead heavy construction H pole line, 6.6km long
– 110kV transformer bay
– 110kV customers free issue transformer
– 20kV substation installation & commissioning
– 20kV distribution network


Glanlee Primary Substation

– 23 Turbines, approx. 32.45mw, Size £1.6m HV Electrical BOP Package
– 110kV Underground cable system, 2km long
– 110kV transformer bay
– 110kV customers free issue transformer
– 20kV substation installation & commissioning
– 20kV distribution network
Clonkeen Switching Site
– Size £1m Contestable Electrical Package
– Installation of 2 off pylons
– Install, test and commission 2 incoming feeder bays
– Install, test and commission 1 overhead line bay
– Install, test and commission control room and protection panels
– Install, test and commission earthing system
C&P’s Wind Power services include:
• design, FATs, testing, acceptance and commissioning procedures
• cable installation up to 132kV
• installation and maintenance of substation plant up to 132kV
• operation and maintenance
• high and low voltage switchgear supply and installation and control
• substation, transformer and switchgear
• transformer specification, procurement & installation
• repair and asset maintenance services
• turbine base earthing installation inspections,
• Lightning protection installation
• Earth resistivity testing